Goregaon-Mulund Link Road: How Mumbai's New Connectivity Corridor Could Impact Property Prices

By Keystone LIV · 23 Nov 2026 · 7 min read

Goregaon Mulund Link Road flats in Goregaon flats in Mulund

The Goregaon-Mulund Link Road is currently being built. This route serves as a connector between Goregaon and Mulund, two Mumbai suburbs. Once constructed, the planned road will shorten travel times between the eastern and western suburbs and promote residential and commercial development throughout its entire length.

The BMC is constructing the GMLR, a road that will link the eastern and western suburbs of Mumbai. It connects the Eastern Express Highway at Mulund to the Western Express Highway close to Goregaon.

The project is 12.2 km long overall. It is more than just a road; beneath Sanjay Gandhi National Park, there are twin tunnels, flyovers, and road widening. As a result, it is the first Mumbai link road featuring a tunnel segment.

The two 4.70-kilometre tunnels are located between 20 and 160 meters below the park. For ventilation and safety, they are connected to one another every 300 meters. The tunnel won't disrupt the forest above it because it lacks surface-level ventilation openings.

The tunnel component alone will cost approximately Rs 6,301 crore, out of a total project cost of over Rs 14,000 crore. On July 13, 2024, PM Modi lay the foundation stone for the tunnel project. There are four stages of the project's construction.

 

Particulars

Details

The Project Authority

BMC

Total Lenght

12.2 km

Twin Tunnel Total Length

4.70 km each

Tunnel Depth

20 -160 metres

Total Project Cost

Rs 14,000 crore

Total Phases

4

Connection

Goregaon to Mulund

 

Goregaon-Mulund Link Road Latest Updates & Progress 2026

Although there have been some delays in the project, work on GMLR has accelerated this year. As of July 2026, this is the current situation.

 

Flyover on the Goregaon side:

It was originally planned to open the 1.2 km flyover between Dindoshi Court and Dadasaheb Phalke Film City by May 31, 2026. Due to alignment delays, that deadline was missed, and the BMC has since changed the opening date to September 2026. According to reports, the flyover's major civil construction is finished, and finishing and safety work is in progress.

 

Tunnel work:

The actual action is currently taking place here. At Film City in Goregaon, the launching shaft has been completely dug out. The first tunnel boring machine has been completed and is prepared to begin excavation as of July 30, 2026. Earth Pressure Balance technique is used in this TBM, which is designed to penetrate the hard basalt rock of Mumbai. Soon after, actual tunnel boring is anticipated to start.

 

Revised timeline:

Earlier, the tunnel was expected to be ready by October 2028. Some recent reports now point to a slightly later window, around February 2029, for tunnel completion with the full 12.2 km corridor becoming operational only after that. 

 

Component

Status (July 2026)

Dindoshi-Film City Flyover

Missed May 2026 target, now expected September 2026

Launching shaft (Goregaon)

Excavation completed

First TBM

Fully assembled, boring to begin

Twin tunnels

Targeted for 2028-2029

Full corridor

Expected to be operational by 2029

 

GMLR runs across Mumbai’s northern suburbs, connecting the western side to the eastern side. It passes through some of the most congested pockets of the city, using a mix of flyovers, road widening and tunnels to avoid traffic snarls on the surface. 

 

The route starts at the Western Express Highway near Goregaon. From here, a flyover takes traffic from Dindoshi Court, takes a turn near Ratnagiri Junction and descends towards Dadasaheb Phalke Film City at the edge of Sanjay Gandhi National Park.

 

From Film City, the road goes underground. Twin tunnels run beneath SGNP connecting Film City in Goregaon to Khindipada in Mulund. This is the longest and most complex stretch of the entire project, since it passes under protected forest land. 

 

On the Mulund side the road comes back over ground. A flyover package including a cable-stayed structure at Dr Hedgewar Chowk connects the tunnel exit to the Eastern Express Highway at Mulund.

 

Route Segment

Details

Starting Point

Western Express Highway, Goregaon

Flyover Goregaon side

Dindoshi Court to Film City via Ratnagiri Junction

Tunnel Entry

Dadasaheb Phalke Film City, Goregaon

Tunnel Exit

Khindipada, Mulund

Flyover Mulund side

Khindipada to Dr Hedgewar Chowk

Ending Point

Eastern Express Highway, Mulund

 

Key Benefits of the Goregaon Mulund Link Road

GMLR is not just another road. It solves a real problem that lakhs of Mumbaikars face every day: getting from the western suburbs to the eastern suburbs without wasting hours in traffic. Here are the main benefits once the project is complete. 

 

Significant reduction in trip time

Currently, it takes 75 to 90 minutes during rush hour to travel from Goregaon to Mulund. This reduces to 15 to 25 minutes with GMLR. For people who commute every day, that is a significant difference. 

 

Reduced strain on current roadways

The majority of the east-west traffic in this area of Mumbai is currently carried by JVLR and Ghodbunder Road, both of which are prone to congestion. In order to prevent gridlock from building up on a single route, GMLR provides commuters with an alternative. 

 

Improved central suburban access

Goregaon and the surrounding western suburbs will be considerably more accessible from places like Mulund, Bhandup, and Nahur. Additionally, it facilitates travel to Malad, Kandivali, and Borivali.

 

No damage to the forest cover of SGNP

Even though the road passes directly beneath the park, there is no disruption to the forest or wildlife above the tunnel because there are no ventilation outlets at the surface.

 

Boost to locations along the path

Increased demand for neighboring homes and offices is typically a result of improved connectivity. Prior to completion, buyers are already showing interest in areas close to the flyovers and tunnel departure sites.

 

How will Goregaon Mulund Link Road impact property prices in Mumbai?

 

Property markets are typically impacted by infrastructure projects like GMLR even before the route opens. Due to the fact that prices typically increase gradually—first upon announcement, then throughout visible development, and then once more following completion—buyers and investors begin examining connected regions early.

 

Goregaon West

Since Metro 2A is already operational in this region, GMLR provides an additional degree of connectivity. In some areas, such as Bangur Nagar, prices can reach Rs 34,000–42,000 per square foot, but the average rate is around Rs 32,000. Growth has been between five and eleven percent annually.

 

Mulund West

Depending on the project and precise location, rates in Mulund West currently range from Rs 24,000 to Rs 29,000 per square foot. Even prior to GMLR, this region experienced consistent single-digit to low double-digit annual growth, in part because to Metro Line 4.

 

Nahur and Bhandup 

These central suburbs sit close to the eastern end of GMLR and are seen as the more affordable entry points into this corridor. Rates here are lower, roughly Rs 21,000-26,000 per sq ft, which is drawing interest from buyers priced out of Mulund West. 

Buyers comparing residential properties in Mumbai can also explore properties in Nahur to assess the locality’s available housing choices.

Area

Current Rate (per sq ft)

Recent Trend

Goregaon West

Rs 32,000

5-11% YoY growth

Mulund West

Rs 24,000-29,000

Steady single to low double-digit growth

Nahur/Bhandup

Rs 21,000-26,000

Emerging, lower entry point

 

It’s worth keeping in mind that past link roads like JVLR and SCLR saw meaningful price gains only after they became fully functional, not just at the announcement stage. GMLR is likely to follow a similar pattern.

 

Which residential areas will benefit from Goregaon Mulund Link Road?

 

If you are planning to buy a flats in Goregaon or Mulund, here are some residential projects in Goregaon, Mulund and nearby areas to consider.

Project Name

Configuration 

Price

Emerald Isle – Tower 16
1, 2, 3 BHK 1.30 Cr – 3.44 Cr

UK Celestique Gardens 

1, 2, 3 BHK 1.05 Cr – 2.53 Cr

GHP Woodland

1, 2 BHK 1.25 Cr – 1.88 Cr

Marathon Neo Valley

1 RK, 1, 2 BHK 35.00 Lac – 98.00 Lac

 

Share this article

Free advisory · Zero brokerage

Talk to a Keystone LIV Advisor

Not sure where to start? We'll help you find the right home for your needs and budget.

  • ✓Expert advice on projects & pricing
  • ✓Site visit support at your convenience
  • ✓Home loan guidance from top banks

Get a free callback

By submitting, you agree to be contacted by Keystone. No spam.

Listening…
Ask Mr. K · Automated Assistant · Keystone LIV
👋 Hi! Looking for a home? Chat with Mr. K — it's free!